Project Location:
Project Description: Andrew leveled off a piece of land on school grounds, which is about 9600 square feet, and built a fire pit in the center of the space, which is being used by the student body for pep rally bon fires. He added a chain link fence to one side of the lot to completely encircle the lot with fencing. (The other three sides were already fenced.) He also built a wood bin and a sand pit (for use in extinguishing the fire.) He then re-seeded the lot.
Project Planning Hours: 20
Project Execution Hours: 200
Project Materials Cost: $1000
Project Advisor: Cliff Evans